The Aveng Strabag joint venture (ASJV) has decided to terminate the Mtentu bridge contract, in the Eastern Cape. The 1.1 km, R1.65-billion bridge forms part of the South African National Roads Agency Limited’s (Sanral’s) N2 Wild Coast road project.
Link to Engineeringnews.co.za
Username or email *
Password *
Remember me Login
Lost your password?