Cable car fully operational at N2WCR’s Msikaba bridge siteCable car fully operational at N2WCR’s Msikaba bridge siteCable car fully operational at N2WCR’s Msikaba bridge siteCable car fully operational at N2WCR’s Msikaba bridge site
  • HOME
  • WHO ARE WE?
  • BUSINESS APPLICATIONS
  • TRANSPORT SOFTWARE
  • MEMBERSHIP SOFTWARE
  • WEB DESIGN
  • WHY CHOOSE US?
  • NEWS
  • SCHEDULE A DEMO

Cable car fully operational at N2WCR’s Msikaba bridge site

August 11, 2021

The temporary cable car installed at the Msikaba bridge site on the N2 Wild Coast Road (N2WCR) project is now fully operational. The cable car is said to drastically reduce the travelling time between the South and North sites of the Msikaba.

Link to Engineeringnews.co.za

Share

  Schedule a Software Demonstration now
We are just a call away on +27 (0)87 150-8178 or Mobile: (0)83 377-8640

About AbaTrans Software

AbaTrans-Software is a dynamic experienced team with a wide range of skills - business analysis, accounting, database administration, design and program development.

We specialize in the production of high-end customized Transport Industry Software Applications, customized business software programs, online SAAS applications and specialized Websites.

Resources

  • Software Plugin shop
  • Terms of Use
  • Privacy Policy
  • Client Portal Login

Send us an Email

Recent News

  • Four suspects arrested on two separate incidents in connection with trafficking of dagga
  • Stratio and Freeway Partnership Brings Predictive Maintenance to Transport Operators
  • Truck driver and crew nabbed after reporting false hijacking and robbery of cargo they were transporting
  • Driver critically injured when bakkie rear-ends truck in Delmas
  • Truck rollover on the George’s Valley road
Copyright 2021 AbaTrans Software.com - All Rights Reserved | P O Box 379, St Helena Bay, Western Cape, South Africa
✕

Login

Lost your password?