The board of the South African National Roads Agency Limited (Sanral) has cancelled tenders to the value of R17.47-billion, citing “material irregularities”. The tenders which the Sanral board did not approve are the Mtentu Bridge Wild Coast project, on the N2, valued at R3.4-billion; the rehabilitation of the R56 Matatiele, in the Eastern Cape, at R1-billion; the N3 Ashburton interchange, in KwaZulu-Natal, at R1.8-billion; and improvements to the EB Cloete interchange (N2 and N3 connection point in KwaZulu-Natal), at R4.3-billion.